External Scaffolding · Temporary Works
Battersea Power Station - Phase 2
We designed the external scaffolding package, including independent access scaffolds, large-scale hoist run-offs, temporary roofs, multi-level large-span beam supports, propping and scaffold façade-retention systems.
A principal challenge was releasing the scaffold bases to allow critical programme activities to proceed. This required multi-level bridging and cantilevered support from bespoke façade brackets, together with large steel trusses spanning between the wash towers. Restricted tie locations also required advanced structural-analysis software to assess the buckling behaviour of the scaffold towers.